Map architecture dependencies
Unused systems that kept running for years out of fear of risk can now be decommissioned risk-free.
In the product
14 systems are potential candidates for decommissioning in wave 1:
- 9 systems with no active process hook — decommissioning without migration
- 5 systems with replaceable interfaces — migration in 4-8 weeks
Combined savings potential €8.6 million p.a. across licences and operations.
Risk note: System ERP-Legacy-7 has a hook into Payroll — must be migrated before decommissioning, otherwise the payroll run is at risk in week 47.
What changes
- Consolidation fails on “we don’t know what’s attached to it”.
- Decommissioning decisions are politics.
- Licence costs rise quietly in the background.
- Systems, processes, costs — in one overview.
- Decisions as a matter of fact with an audit trail.
- Savings potential per system with a well-founded risk analysis.
What it delivers
Licence & operating costs p.a. after consolidation wave 1.
instead of 23
Redundant tools in the engineering stack.
Audit trail for every decommissioning decision.